KoCAD · 常见问题
Questions: materials, prices, weight and 部材表
Why is the price pending? Net vs purchase weight? Where does the process cost come from? Can I change a row's material?
此文章暂无您的语言版本,以English显示。
- Where do materials and prices come from? From the KOREOS material register (the same as 見積): density, kg/m or kg/m², price per material/thickness.
- Why "Pending" or ¥0? The register has no confirmed price for that material/size, or you are offline without a downloaded table. The subtotal adds only known values; complete it in KOREOS.
- Net vs purchase weight: net is the geometry (with holes and cut-outs); purchase is the raw stock (whole sheet or bar) and can be higher. Sheets has "Whole stock / net weight".
- Process cost: the standard times and rates registered by your company. A process without a registered time shows as pending.
- Can I change a row? Yes: Materials & purchasing → Edit list. The row is marked Modified and is not replaced when the geometry changes; Restore model row reverts it.
- Must the part name be a catalogue name? No. The badge compares the stock material, not the part's nickname.
- Does opening the list place an order? Never. Purchasing is still confirmed separately.
- Comparison with the 見積: KOREOS → Case BOM compares mass and cost with the 見積 (target ±5 %).