Ir al contenido

KoCAD · Preguntas frecuentes

Questions: materials, prices, weight and 部材表

Why is the price pending? Net vs purchase weight? Where does the process cost come from? Can I change a row's material?

Actualizado Versión actual KoCAD 0.31.0PC (Windows, etc.)

Este artículo aún no está traducido a su idioma: se muestra la versión en English.

  • Where do materials and prices come from? From the KOREOS material register (the same as 見積): density, kg/m or kg/m², price per material/thickness.
  • Why "Pending" or ¥0? The register has no confirmed price for that material/size, or you are offline without a downloaded table. The subtotal adds only known values; complete it in KOREOS.
  • Net vs purchase weight: net is the geometry (with holes and cut-outs); purchase is the raw stock (whole sheet or bar) and can be higher. Sheets has "Whole stock / net weight".
  • Process cost: the standard times and rates registered by your company. A process without a registered time shows as pending.
  • Can I change a row? Yes: Materials & purchasing → Edit list. The row is marked Modified and is not replaced when the geometry changes; Restore model row reverts it.
  • Must the part name be a catalogue name? No. The badge compares the stock material, not the part's nickname.
  • Does opening the list place an order? Never. Purchasing is still confirmed separately.
  • Comparison with the 見積: KOREOS → Case BOM compares mass and cost with the 見積 (target ±5 %).

¿Le ayudó esta página?